1 INTRODUCTION

1.1 GENERAL

1.1.1 Scope of this Section

1. This Section specifies the general clauses applicable to Works being carried out in accordance with this Specification.

1.1.2 Scope of the Qatar Construction Specification

1. The clauses in this Specification are applicable to each and every part of the Works. Their function is to bring together all those statements which are normally common to most types of work.

2. The Qatar Construction Specification applies to the entire Works, whether on the Site or in yards, workshops and factories employed elsewhere in connection with the Works.

1.1.3 References

1. The following standards are referred to in this Part:

BS 6100......................Building and civil engineering: Vocabulary

BS ISO 80000 ............Quantities and Units

BS EN 1991-1-4 .........Eurocode 1. Actions on structures. General actions. Wind actions

BS EN 1992-1-1 .........Eurocode 2. Design of concrete structures. General rules and rules for buildings

ASCE/SEI 7-05...........Minimum Design Loads for Buildings and other Structures

Guide to the Design of Concrete Structures in the Arabian Peninsula,

2008 Seismic hazard and seismic design requirements for the Arabian Peninsula region. The 14th World Conference on Earthquake Engineering October 2008

Civil Aviation Authority wind records. Ministry of Communication & Transport, Department of Civil Aviation & Meterology.

1.1.4 Precedence of Specification and Documents

1. The precedence of documents shall be:

1.2 COMPLIANCE

1.2.1 Compliance with the Qatar Construction Specification

1. Unless otherwise stated in the Project Documentation, the Contractor shall comply with every requirement of the Qatar Construction Specification that is relevant to the type of work forming any part of the Contract and shall adopt whichever permissible option or alternative that is best suited to the needs of the construction work being undertaken.

2. Any information in the Contract documents as to the whereabouts of existing services and mains is approximate and for the guidance of the Contractor who shall not be relieved of his obligations under of the General Conditions of Contract .

1.2.2 Compliance with the General Conditions of Contract

1. The Qatar Construction Specification is intended for use with the General Conditions of Contract.

2. The Contractor shall comply with the provisions of the General Conditions of Contract in the course of construction of the Works.

1.3 STANDARDS

1.3.1 References to Standards

1. Any standard referred to in this Specification shall be deemed to be the version and/or standard(s), that was current forty-two days prior to the date of return of Tenders.

2. Any standard referred to in this Specification shall be taken as a reference to an equivalent Specification.

3. The Contractor shall have copies of all referenced standards applicable to the work being undertaken. Translations of standards not written in English shall be provided where necessary.

1.3.2 Government Published Specifications, Regulations, Notices and Circulars

1. The works shall be executed in accordance with the following Government specifications, regulations, notices and circulars:

2. The Contractor shall be deemed to have his own copy of the Government specifications, regulations, notices and circulars given at (a) to (t) above.

3. Where any standard publication, specification, regulation, notice, etc or any correspondence refers to a Government Ministry, department, division, section, etc it will be deemed to be the same as any successor Ministry, department, division, section, etc which has or may subsequently be officially promulgated by the Government of the State of Qatar.

1.3.3 Survey Marks

1. The Contractor shall consult the Engineer prior to any earth or other works to determine if the work is likely to disturb survey marks. If the Engineer requires a survey mark to be moved the Contractor will be responsible for recreating the survey mark to an approved design and specification, and for resurveying the point using survey companies approved by the Engineer authority.

2. The Contractor shall be responsible for the protection of the survey marks within the boundaries of the site for the duration of the contract period, and shall be liable for all costs of any remedial work required by the Engineer.

3. On the practical completion of the Works the Engineer will issue a certificate stating that all survey marks, whether disturbed or otherwise by the Contractor, have been reinstated or protected to the satisfaction of the Engineer.

4. In the event of failure to comply with the requirements of this Clause the Engineer, without prejudice to any other method of recovery, may deduct the costs of any remedial work after the practical completion date carried out by the Engineer, from any monies in its hands or which may become due to the Contractor.

1.4 TERMS AND DEFINITIONS

1.4.1 General

1. The following terms and conditions shall apply when used within, or in association with, the Qatar Construction Specification. Terms, which are restricted in their application to certain types of material or workmanship, are dealt with in the appropriate Section.

2. The definitions given in the General Conditions of Contract shall apply to this specification.

1.4.2 Approved

1. means terms such as “approved’, “approved by”, “to the approval”, “as directed” and the like refer always to approval or directions given by the Engineer in writing.

1.4.3 Contract

1. means the binding agreement entered into between the parties and the Contractor for the construction of the Works.

1.4.4 Contract Documents

1. means documents which together form the Contract

1.4.5 Contractor

1. means the party responsible for the construction of the Works.

1.4.6 Drawings

1. The drawings included in the Project Documentation.

1.4.7 Engineer

1. means the party appointed by the Owner to administer the Contract

1.4.8 Engineer’s Representative

1. means the party appointed from time to time by the Engineer to perform duties on behalf of the Engineer whose authority and delegated powers shall be notified in writing to the Contractor by the Engineer.

1.4.9 Government

1. means the Government of the State of Qatar, including its ministries and offices

1.4.10 Government Departments and Utility Services

1. means any governmental, semi-governmental, administrative, fiscal or judicial ministry, department, commission, authority, tribunal, agency, municipality or body, and shall include the provider of electricity, gas, water, wastewater and other public services, and any party with a regulatory function under the laws of the State of Qatar.

1.4.11 Guarantee

1. A Guarantee is a written assurance that a material, product, component, item of equipment, finishing or any other part of the Works meets certain defined standards or quality criteria and/or lasts for a certain length of time.

2. A warranty is the same as a Guarantee as defined in Clause 1.4.17.1.

1.4.12 Independent Agency

1. means a party where specified in the Contract Documents or as instructed by the Engineer as an Approved agency who is responsible for specific tasks assigned to that party by the Contract Documents

1.4.13 Owner

1. means the party for whom the Project is being undertaken and to whom the handover of the final product will be made.

1.4.14 Permanent Works

1. means the permanent works, forming part of the Works, to be designed and / or executed and completed by the Contractor under the Contract.

1.4.15 Plant

1. means, irrespective of ownership, all plant, facilities, temporary structures and accommodation, equipment, tools, appliances, apparatus, machinery, vehicles and other things required for the design, execution and completion of the Works and the remedying of defects, whether imported or locally supplied, but excluding Temporary Works and any other things intended to form or forming part of the Permanent Works

1.4.16 Project Documentation

1. All documents associated with and applicable to the Project Contract.

1.4.17 Singular and Plural

1. Words importing the singular only also include the plural vice versa where the context requires.

1.4.18 Site

1. Means the places provided by the Owner where the permanent works are to be executed and to which Plant and Materials are to be delivered, any other places that may be specified in the Contract Documents or by an instruction of the Engineer as forming part of the Site

1.4.19 Specifications

1. All specifications contained in the Contract including any modifications or additions thereto as may from time to time be issued or approved in writing by the Engineer.

1.4.20 Specified

1. Specified in the Project Documentation.

1.4.21 Temporary Works

1. means temporary works of every kind (other than Plant) required on the Site for the execution and completion of the Permanent Works and the remedying of Defects.

1.4.22 Works

1. means all works, supplies and services of any kind, including Permanent Works and Temporary Works, required for the project and to satisfy the requirements of the Contract Documents.

1.5 ABBREVIATIONS AND SYMBOLS

1.5.1 General

1. Units shall generally be in accordance with the Systèm International d’Unités and the relevant provisions of BS ISO 80000

2. The following abbreviations are used in this Specification:

3. Reference to a technical society, institution, association or governmental authority is made in the Specifications in accordance with the following abbreviations:

1.5.2 Site Conditions and Information Technologies)

1. The Site conditions shall be assumed to be as follows for tendering purposes:

Maximum ambient temperature ..........................50C

Minimum ambient temperature ........................... 5C

Design ambient temperature ...............................50C

Maximum metal temperature under the sun .......85C

Maximum ambient humidity ................................100%

Minimum ambient humidity ................................. 20%

Design ambient humidity .....................................100%

50-year return period Wind Speed:

Yearly rainfall.......................................................80 - 150 mm

2. The wind is very directional and that the W -NNW sector predominates for velocities greater than 8m/s (30km/h). However, the wind in coastal areas tends to exhibit a diurnal pattern, with onshore winds during daylight hours changing to offshore at night.

3. The temperature is relatively mild from October to May and hot from June to September.

4. The relative ambient humidity is generally low from October to May and generally high from June to September.

5. Under certain climatic conditions, considerable condensation may take place.

6. A considerable amount of salt is contained in the atmosphere which together with the relatively high ambient humidity, can produce sever corrosion problems.

7. Distribution and occurrence of rainfall events are very erratic. Rainfall events are generally of a high intensity with a short duration and usually occur between December and March.

8. The prevailing wind directions are from the north and west.

9. The seismic design for all building structure shall be based upon local seismic accelerations recommended as per ASCE 7-10, IBC 2012 or BS EN 1998-1:2004. Local seismic spectral accelerations based upon uniform hazard response spectra for 475 year and 2475 year return period as below.

Peak Ground Acceleration (PGA) 0.2 second Spectral Acceleration (g) - Ss 1 second Spectral Acceleration (g) - Ss
475 year 2475 year 475 year 2475 year 475 year 2475 year
0.045 0.10 0.090 0.147 0.045 0.065

10. Wind tunnel test is recommended for buildings under below criteria

(a) Total building height exceeding 120m from ground.

(b) Structure with irregular geometry or shape.

(c) Unusual terrain or surrounding structure in the area.

(d) Any other factor as per design requirements or designer recommendation.

11. The ratio of the wind speed for any return period to the 50 year return period wind speed as per Peterka & Shahid Equation is

VT / V50 = [0.36+0.1 ln (12T)]

12. Building structure design working life shall be minimum as specified below

Design working life category Indicative design working life (years) Examples
1 10 Temporary structures (a)
2 10 to 25 Replaceable structural parts, eg. Gantry girders, bearings
3 15 to 30 Storage and similar structures
4 50 to 75 Building structures and other common structures
5 120 Civil engineering structures like bridges, tunnel etc.

(a) Structures or parts of structures that can be dismantled with intention of being reused, aren’t temporary structures.

1.6 LANGUAGE

1.6.1 Contract Language

1. All communications, meetings and documentation shall be in English.

END OF PART