3 PLUMBING PIPEWORK IN TRENCHES ...................................................... 2
3.1 GENERAL ...................................................................................................... 2
3.1.1 Scope 2
3.1.2 References 2
3.2 PIPES AND FITTINGS .................................................................................. 3
3.2.1 General Requirements 3
3.2.2 Pipe Materials 3
3.3 PIPEWORK JOINTING .................................................................................. 3
3.3.1 General Requirements 3
3.4 PIPE LAYING ................................................................................................ 4
3.4.1 General 4
3.4.2 Bedding 4
3.4.3 Concrete Protection to Pipes 5
3.4.4 Completion of Pipe Surround 6
3.4.5 Backfilling 6
3.4.6 Protective Coatings 6
3.4.7 Pipes under Buildings 6
3.4.8 Avoidance of Contamination 7
3.4.9 Restraint of Pipes 7
3.4.10 Testing of Pipework 7
3.4.11 Surface Boxes 7


3 PLUMBING PIPEWORK IN TRENCHES
3.1 GENERAL

 

3.1.1 Scope
1 This Part specifies the requirements for pipes and fittings for below ground plumbing works.

2 Related Sections and Parts are as follows:

 

This Section

Part 1 General
Part 2 Water Distribution
Part 6 Commissioning of Systems
Section 1 General
Section 5 Concrete
3.1.2 References
1 The following standards are referred to in this Part:

 

 

BS 743 ........................Materials for damp-proof courses.
BS 864 .......................Capillary and compression fittings for copper tubes and copper alloy.
BS 882 ........................Aggregates from natural sources for concrete
BS 1142 ......................Fibre building boards BS 2494 Specification for elastomeric joint rings for pipework and pipeline.
BS 2871 ......................Specification for copper and alloy tubes.
BS 3505 ......................Specification for unplasticized polyvinyl chloride (PVC-U) pressure pipes for cold potable water.
BS 4127 ......................Specification for light gauge stainless steel tubes.
BS 4346 ......................Joints and fittings for use with unplasticized PVC pressure pipes.
BS 4772 ......................Ductile iron pipes and fittings.
BS 4991 ......................Propylene copolymer pressure pipe.
BS 5114 ......................Specification for performance requirements for joints and compression fittings of use with polyethylene pipes.
BS 6076 ......................Tubular polythene film for use as a protective sleeving for buried iron pipes and fittings.
BS 6572 ......................Specification for blue polyethylene pipes up to nominal size 63 for bellow ground use for potable water.
BS 6700 ......................Specification for design, installation, testing and maintenance of services supplying water supplying water for domestic use within buildings and their curtilages.
3.2 PIPES AND FITTINGS

 

3.2.1 General Requirements
1 Pipes shall have adequate strength to meet the loading requirements, be sufficiently robust to withstand site handling and be sufficiently durable to remain watertight for the anticipated life of the system. Pipes and joints should remain sufficiently water tight to prevent the ingress of ground water.

2 Every pipe, pipe joint and connected fitting shall be capable of withstanding, without damage or deterioration, sustained temperatures of up to 65.C when operating under normal working pressures.

3 Pipe materials, fittings, linings and jointing materials shall impart no taste, colour, odour or toxicity to the water nor promote or foster the microbial growth under the conditions where they are going to be installed.

4 If pipes, pipe joints or fittings are of dissimilar metals, measures shall be taken to prevent corrosion. Contact between pipework components of dissimilar metals shall be avoided in below ground installations.

 

 

3.2.2 Pipe Materials
1 Copper pipework shall comply with the relevant provisions of BS 2871: Part 1, Table Y, coated with seamless continuous PVC sheeting. Copper and copper alloy tube fittings should comply with the relevant provisions of BS 864: Part 2.

2 The use and installation of polyethylene pipework shall comply with the relevant provisions of BS 6572. Copper alloy tube fittings for polyethylene pipes shall comply with the relevant provisions of BS 864: Part 3, Joints for polyethylene pipes shall comply with the relevant provisions of BS 5114 and BS 3505.

3 The use and installation of polypropylene pipework shall be in accordance with the relevant provisions of BS 4991 and shall be Series 1.

4 The use and installation of unplasticized PVC pipework shall comply with the relevant provisions of BS 3505. Solvent welded joints and fittings for PVC-U pipes shall comply with the relevant provisions of BS 4346: Part 1. Mechanical joints and fittings for PVC-U pipes shall comply with the relevant provisions of BS 4346: Part 2.

5 Ductile iron pipework shall comply with the relevant provisions of BS 4772.

6 Stainless steel pipework shall comply with the relevant provisions of BS 4127.

 

3.3 PIPEWORK JOINTING

 

3.3.1 General Requirements
1 Jointing of pipes shall be in accordance with the relevant provisions of BS 6700.

2 All proprietary joints shall be made in accordance with the manufacturer’s instructions.

 

 

3 Care shall be taken to establish satisfactory jointing techniques for all water service pipework. All burrs shall be removed from the ends of the pipes and any jointing materials used shall be prevented from entering the water system

4 All piping and fittings shall be cleaned internally and be free from particles of sand, soil metal filings and chips etc.

5 Jointing systems using elastomeric sealing rings shall be Type W, complying with the relevant provisions of BS 2494, and shall be obtained from the pipe manufacturer.

 

3.4 PIPE LAYING

 

3.4.1 General
1 Where socketed pipes are required to be laid on a granular or sand bed, or directly on a trench bottom, joint holes shall be formed in the bedding material or final excavated surface to ensure that each pipe is uniformly supported throughout the length of its barrel and to enable the joint to made.

2 Pipes shall be laid on setting blocks only where a concrete bed or cradle is used.

3 Where pipes are required to be bedded directly on the trench bottom, the final excavated surface shall be trimmed and levelled to provide even bedding of the pipeline and shall be free from all extraneous matter that may damage the pipe, pipe coating, or sleeving. Where rock is encountered, the trench shall be cut at least 150 mm deeper than other ground and made up with well compacted selected fill material.

4 No protective cap, disc or other appliance on the end of a pipe or fitting shall be removed permanently until the pipe or fitting which it protects is about to be jointed. Pipes and fittings, including any lining or sheathing, shall be examined for damage and the joint surfaces and components shall be cleaned immediately before laying.

5 Suitable measures shall be taken to prevent soil or other material from entering pipes, and to anchor each pipe to prevent flotation or other movement before the Works are complete.

6 Where pipeline marker tape is specified, it shall be laid between 100 mm and 300 mm above the pipe.

 

 

3.4.2 Bedding
1 Bedding for pipes shall be constructed by spreading and compacting granular bedding material over the whole width of the pipe trench. After the pipes have been laid, additional material shall, if required, be placed and compacted equally on each side of the pipe, and where practicable, this shall be done in sequence with the removal of the trench supports.

 

 

2 Unless otherwise detailed in the Project Documentation, bedding material shall be in accordance with Table 3.1

 

 

Table 3.1 Bedding Material
Pipe Diameter
Bedding

up to 65 mm
Sand

65 - 100 mm
10 mm single sized aggregate

100 - 200 mm
10 or 14 mm single sized or 14-15 mm graded aggregate

Over 200 mm
10, 14 or 20 mm single sized or 15-5 or 20-5 mm graded aggregate.

3 Nominal single sized aggregate and graded aggregate shall comply with Table No. 4 of BS 882.

4 Sand for bedding material shall comply with the relevant provisions of BS 882.

5 Bedding systems other than those specified above may be allowed upon approval of the Engineer or as recommended by the pipe manufacturer.

 

 

3.4.3 Concrete Protection to Pipes
1 Pipes to be bedded on or cradled with concrete shall be supported on precast concrete setting blocks. The top face of each block shall be covered with two layers of compressible packing complying with BS 743.

2 Concrete provided as a protection to pipes shall be Grade C20, placed to the required depth in one operation.

3 Where pipes with flexible joints are used, concrete protection shall be interrupted over its full cross-section at each pipe joint by a shaped compressible filler of bitumen impregnated insulating board to BS 1142 or equally compressible material. The thickness of the compressible filler shall be in accordance with Table 3.2.

 

 


Table 3.2 Thickness of Compressible Filler
Nominal bore of pipe (mm)
Thickness of compressible filler (mm)

up to 300
Over 300 and up to 600
Over 600 and up to 1200
13
25
38


4 Rapid hardening cement shall not be used in concrete for the protection of plastics pipe.

5 Plastics pipes shall be wrapped with a layer of plastic sheeting complying with a composition in accordance with Clause 3 of BS 6076 and a nominal thickness of 125 microns before being surrounded by concrete.

 

 

6 Concrete work shall comply with the relevant provisions of Section 5, Concrete.

 

 

3.4.4 Completion of Pipe Surround
1 Fill material shall, where required, be placed and compacted over the full width of the trench in layers not exceeding 150 mm before compaction, to a finished thickness of 250 mm above the crown of the pipes.

 

 

3.4.5 Backfilling
1 Backfilling shall, wherever practicable, be undertaken immediately the specified operations preceding it have been completed. Backfilling shall not, however, be commenced until the parts of the Works to be covered have achieved a strength sufficient to withstand all loading imposed thereon.

2 Backfilling around existing structures shall be undertaken in such manner as to avoid uneven loading or damage.

3 Filling material to excavations shall be deposited in layers not exceeding 250 mm unconsolidated thickness and compacted to 95% modified proctor.

4 Where the excavations have been supported and the supports are to be removed, these, where practicable, shall be withdrawn progressively as backfilling proceeds in such a manner as to minimise the danger of collapse. All voids formed behind the supports shall be carefully filled and compacted

 

 

3.4.6 Protective Coatings
1 Coatings, sheathings or wrappings shall be examined for damage, repaired where necessary, and made continuous before trench excavations are backfilled.

 

 

3.4.7 Pipes under Buildings
1 Where a pipe has less than 300 mm of cover under a load bearing slab, it should be surrounded with concrete as an integral part of the slab. Where possible, the concrete surround shall be poured at the same time as the slab. The surround shall be tied to the slab with nominal steel reinforcement placed vertically with turned over ends.

2 No provision for pipe flexibility along the concrete surround shall be made, unless an expansion joint is included in the slab. A construction joint should be included in the surround at that point which must also coincide with a pipe joint.

3 In normal, stable ground conditions, and with 300 mm or more of cover to the pipeline beneath the slab, a total granular surround can be used as a pipe bedding. Refer to Clause 3.4.2 for bedding specification.

4 Flexibility shall be incorporated into the pipeline as it leaves any concrete surround.

5 Where plastic pipes are to be surrounded in concrete, Clause 3.4.3 of this Part shall be complied with.

 

 

3.4.8 Avoidance of Contamination
1 No pipe shall be laid or installed near a sanitary manhole, cesspool, septic tank, soakaway, refuse pit or other feature likely to cause the water to become contaminated and/or cause deterioration to the pipe material.

2 Any pipe that crosses over a sewer shall be laid so that there is at least 600 mm clearance between the pipe barrels. Any pipe that lies adjacent to a sewer shall be laid so that there is at least 3m between the barrels. Plumbing pipes shall not be laid below sewers.

3 Where the above criteria cannot be met, and with the approval of the Engineer in writing, the pipe shall be encased in concrete. The limit of the concrete encasement shall be determined on site by the Engineer. No breaks in the concrete encasement shall be made at joints. If the concrete encasement extends over one or more joints it shall be treated as a beam and reinforced appropriately; in such cases, the Contractor shall prepare reinforcement details with supporting calculations and submit them to the Engineer for approval.

4 Where it is necessary to determine the extent of contamination, the Contractor shall arrange for soil samples to be taken and tested. The locations at which soil samples are taken and the number of samples to be taken shall be determined by the Engineer.

 

 

3.4.9 Restraint of Pipes
1 Except where the method of jointing and normal trench backfill are adequate to prevent longitudinal movement, Grade C20 concrete thrust blocks cast in contact with undisturbed ground shall be constructed at changes in direction, junctions and blank ends.

2 Any additional excavation required to accommodate thrust blocks shall be carried out after the bend or branch is in position and the thrust face shall be trimmed back to remove all loose or weathered material immediately prior to concreting.

3 Thrust blocks shall be required to develop adequate strength before any internal pressure is applied to the pipeline.

4 Where plastic pipes are to be surrounded in concrete, Clause 3.4.3. of this Part shall be complied with.

 

 

3.4.10 Testing of Pipework
1 Pressure tests shall be carried out on below ground plumbing pipes. Test procedures are detailed in Part 6 of this Section.

 

 

3.4.11 Surface Boxes
1 Surface boxes shall be provided to give access to operate valves.

 

 

END OF PART