OCCUPANCY USED FOR EDUCATIONAL PURPOSES THROUGH THE TWELFTH GRADE BY SIX OR MORE PERSONS FOR 4 OR MORE HOURS PER ADY OR MORE THAN 12 HOURS PER WEEK
IX |
OPERATING FEATURES |
ANY SCHOOL BUILDING |
A |
EMERGENCY PLAN |
REQUIRED |
1 |
EMERGENCY PLAN REQUIREMENTS |
1 |
PROCEDURES FOR REPORTING OF EMERGENCY |
REQUIRED |
2 |
OCCUPANT AND STAFF RESPONSE TO EMERGENCY |
3 |
EVACUATION PROCEDURES APPROPRIATE TO THE OCCUPANCY, EMERGENCIES AND HAZARD |
4 |
APPROPRIATENESS OF THE USE OF ELEVATORS |
5 |
DESIGN & CONDUCT OF FIRE DRILLS |
6 |
TYPE & COVERAGE OF BUILDING FIRE PROTECTION SYSTEM |
7 |
OTHER ITEMS THAT ARE NECESSARY IN AN EMERGENCY PLANS AS MAY BE REQUIRED BY QCD |
B |
EMERGENCY EXIT DRILLS |
|
|
1 |
EMERGENCY EGRESS AND RELOCATION DRILLS |
COMPLYING WITH CHAPTER 14 AND 4.7 NFPA 101 |
|
|
DRILL FREQUENCY |
NOT LESS THAN 1 PER MONTH |
REQUIRED |
IN SUMMER SEASON OR OTHER SEVERE WEATHER CONDITIONS |
PERMITTED TO BE DEFERRED |
CONDITION |
NOT LESS THAN 4 DRILLS CONDUCTED BEFORE THE DRILLS ARE DEFFERED |
REQUIRED |
2 |
ORDERLY EVACUATION |
EMPHASIS ON ORDERLY EVACUATION RATHER SPEED |
REQUIRED |
3 |
SIMULATED CONDITIONS |
DRILLS HELD AT EXPECTED & UNEXPECTED TIMES |
4 |
RELOCATION AREA |
|
REQUIRED |
C |
INSPECTION |
|
REQUIRED |
|
DUTY OF PRINCIPALS, TEACHER AND STAFF |
TO INSPECT ALL EXIT FACILITIES TO ENSURE THAT ALL STAIRWAYS, DOORS & OTHER EXITS ARE IN PROPER CONDITION |
DAILY INSPECTION REQUIRED |